HS2
HS2 Limited commissioned our services to design a 4.1km diversion to the Bicester-Newton Longville 600NB high-pressure gas pipeline.
The project involved:
- Designing the solution (including all site work)
- Relocation of Steeple Claydon HP/IP and IP/MP PRS
- Design and supply of the pressure reduction skid units for Calvert AGI
Key considerations for this project included: adhering to the corridor prescribed by HS2; adapting to proposed road network changes; and, applying assumptions to mitigate for the immature nature of the design.